La Reserve Aparthotel in Manchester with its new non-combustible cladding
PROJECT PROFILE

La Reserve Aparthotel, Manchester:
Façade Remediation Around an Operational Hotel

INTRODUCTION

La Reserve Aparthotel sits in the heart of Manchester city centre, close to Piccadilly station and bordering the Northern Quarter and Ancoats. Its 85 apartments and penthouses are let for anything from a few nights to several months, and the building also has a bar, dining area, meeting room and gym. Concerns about its cladding, particularly its combustibility, meant the façade had to be replaced while guests continued to stay.

Starfish Construction removed the existing cladding and replaced it with a new non-combustible system over a 10-month programme. We designed remedial details as defects from earlier construction came to light, and used scaffolding, mast climbers, suspended cradles and rope access to reach every elevation. The aparthotel remained operational throughout.

LA RESERVE APARTHOTEL, MANCHESTER

Project Highlights at a Glance

  • Location: Manchester city centre, beside the Rochdale Canal
  • Sector: Hospitality (aparthotel)
  • Our Role: Façade remediation contractor, with in-house design of remedial details
  • Scope of Works: Review of existing investigation information and further investigations; removal of the existing cladding and replacement with a new non-combustible cladding system; bespoke balcony and window detailing; assessment and remedial design for defects found during stripping; access by scaffolding, mast climbers, suspended cradles and rope access; road and canal-side access management
DURATION

10 Months

APARTMENTS

85

REPLACING A FAÇADE
WITHOUT CLOSING THE HOTEL

The building's owner, a long-standing client for whom Starfish Construction had delivered roofing refurbishments over many years, had engaged several consultants to establish how serious the problems with the façade were. With concerns about how the façade had been built, and in particular the combustibility of its cladding, they wanted the issues resolved.

The façade had to be replaced while the aparthotel stayed open to guests booking anything from a few nights to several months.

A first round of tendering had ended without a preferred contractor. Invited into the process at that point, we reviewed the existing investigation information, carried out our own investigations and put forward an alternative proposal that met the overall brief and offered savings against the original tender. Our record of delivery for the client, and our approach, were the deciding factors in the award.

Taking Time to Understand the Building

La Reserve had been through earlier works of varying standards. Before committing to a design, we reviewed the examination information already gathered for the client and carried out our own investigations into how the existing façade had been built.

Aerial view of the aparthotel with sections of its façade stripped back during the works

Our in-house design capability meant remedial details could be designed quickly as new issues came to light, so the programme kept moving.

Stripping the external skin then revealed further issues left by previous contractors. We assessed each one as it was exposed and agreed the remedial work with the client, working closely with the client's property consultants throughout.

Suspended cradles and mast climber on a lower elevation during the cladding replacement

Our Expertise

CHOOSING THE RIGHT ACCESS FOR EVERY ELEVATION

With elevations on two busy streets and a rear elevation backing onto the Rochdale Canal, no single access method would work for the whole building. We used scaffolding, mast climbers, suspended cradles and rope access, each matched to the elevation it served and chosen to keep the impact on the business to a minimum.

Matching the access method to each elevation let work continue on the street and canal sides without closing the building.

The existing cladding was removed and replaced with a new non-combustible system, with bespoke detailing to each balcony and window. Our experience of this type of construction, and of current construction guidance, shaped the remedial design as the works progressed.

Canal elevation of the aparthotel with mast climbers and cradles in place
Mast climber on the street elevation, beside a busy city-centre road
Upper floors of the aparthotel during installation of the new cladding system
Twin mast climbers on the narrow elevation between the canal and a neighbouring warehouse
New white cladding on the street corner of the aparthotel, with a mast climber still in place
Completed façade and balconies of La Reserve Aparthotel rising above the canal

    Delivering Around an Operational Aparthotel

    The aparthotel stayed open throughout, so we planned the works to keep as many rooms as possible available to guests. We worked closely with the Canal & River Trust and the local roads authority so that the works could continue with limited impact on traffic in this busy part of the city.

    Despite delays caused by COVID-19 restrictions, the works had minimal impact on the day-to-day running of the aparthotel.

    As the project progressed, COVID-19 restrictions brought delays to the initial programme and new working requirements, and we worked to strict COVID-19 safety guidelines. Our road and access management kept the aparthotel and the surrounding area accessible, and the site operated without any issues.

    Cradles, scaffolding and a mast climber on the elevation backing onto the Rochdale Canal
    LEAVING A POSITIVE LEGACY

    A refreshed, modern building for a thriving part of Manchester

    The existing cladding has been replaced with a new non-combustible system, giving La Reserve a fresh, modern appearance and resolving the combustibility concerns that prompted the works. Guests continued to stay throughout, in rooms ranging from one-bedroom apartments to penthouses with hot tubs and large decked terraces.

    La Reserve is the most extensive project Starfish Construction has delivered for this client to date. It shows how investigation, remedial design and varied access can be coordinated around an occupied hospitality building in a constrained city-centre location.

    PROJECT SUMMARY

    • Busy city-centre location backing onto the Rochdale Canal.
    • 85 apartments, from one-bedroom apartments to penthouses with hot tubs and large decked terraces.
    • All works carried out while the aparthotel was occupied, including during COVID-19 lockdown.
    • Existing cladding removed and replaced with a new non-combustible system.
    • Bespoke detailing to each balcony and window.
    • Remedial work designed in-house as defects from earlier construction were exposed.
    • Scaffolding, mast climbers, suspended cradles and rope access.
    • Road and access management kept the site operating without any issues.