Our client inherited the Hereford site after acquiring several brands. The site required some upgrading, including the CO2 recovery unit. The refurbishment of the CO2 recovery unit building had a time-critical completion day due to the new CO2 plant equipment arriving from Mainland Europe that had no flexibility on the delivery date.
UK Wide Enquiries: 0333 016 5399
info@starfishconstruction.com
Project Profiles
Every sector has a unique set of requirements for effective buildings. Its safety, sustainability, visual aspect, building performance & efficiency. Delivering bespoke solutions that meet the demands and legislation of your sector is deep-rooted in our DNA. Our sector experience and accreditations allow us to be a valued service and product provider while guiding you to informed decision making.
Browse our project profiles which demonstrate our sector support and project capability.
Articles tagged with: Technical Survey
Roof and cladding replacement and asbestos removal project for Redruth superstore.
Sixteen-week mansard roof panel replacement project for local authority high school, completed during term-time.
Starfish Construction carried out a technical survey to pinpoint major issues with the roof and installed a new system with a predicted 40-year lifespan.
This project’s original scope of works included installing a new curtain walling system to the building’s main entrance and removing the existing stone cladding panels, which were a risk because sections were coming loose. Additionally, it required replacing 350 m2 of the flat roof above the offices.
The investigation, Galbestos removal and re-roofing of two bonded warehouses and improving the efficiency of the buildings.