Our moisture mapping and U-value calculations demonstrated the existing roof was in suitable condition for an overlaid system, bringing significant cost savings for the client.
Our extensive range of technical surveying expertise and services allowed us to carry out internal assessments, along with drone surveys of the property which identified several critical issues.
The investigation, Galbestos removal and re-roofing of two bonded warehouses and improving the efficiency of the buildings.
This project’s original scope of works included installing a new curtain walling system to the building’s main entrance and removing the existing stone cladding panels, which were a risk because sections were coming loose. Additionally, it required replacing 350m2 of the flat roof above the offices.
Scottish Water has invested £5.5m in the upgrade of Laighpark, which serves over 74,000 customers in the Paisley area. This upgrade is part of a more comprehensive investment programme to improve water treatment and flood defences along the River Clyde and protect the natural environment.
Starfish Construction worked with SGP Facilities Management to rectify drainage problems at a local authority school.